News

Beautification of the roundabout located on the CV-905 with access to the N-332

22.07.2021
Beautification of the roundabout located on the CV-905 with access to the N-332
This roundabout has been embellished with a total of 28 flamingos, approximately 2 meters high, with a 10-centimeter relief carved in polystyrene and fiberglass on its exterior finish. A fence of approximately 30 meters in length has also been executed that surrounds the entire base of the monument as a visual of the whole. The total investment has amounted to 18,500 euros.

The pergola of the Paseo Vista Alegre has new led lighting

21.07.2021
The pergola of the Paseo Vista Alegre has new led lighting
Last Sunday, coinciding with the inauguration of the International Habaneras and Polyphony Contest, the lighting of the new pergola lighting of this central Torrevieja promenade was carried out. The installation has been carried out on the lower part of the metal beams of the pergola, with a flexible aluminum, lacquered in white, which has inside the led strip with a quantity of 180 LEDs per linear meter, being approximately 600 meters the that have been placed. The chosen led strip produces a linear light effect so that the individual spot of illuminated led is not seen.

More than 3,000 people visit the Pascual Flores kayak in the five days that it has been docked in the port of Torrevieja

06.07.2021
More than 3,000 people visit the Pascual Flores kayak in the five days that it has been docked in the port of Torrevieja
The image of the many families who have taken the opportunity to take their photos with their cameras or mobile phones in search of that image to remember in this spectacular enclave, which will return to the delight of Torrevieja next October, has been iconic.

Presented the new boat adapted for the Paralympic rower of the Marina Internacional yacht club, Juan Luis Moraes Fiego

05.07.2021
Presented the new boat adapted for the Paralympic rower of the Marina Internacional yacht club, Juan Luis Moraes Fiego
On the morning of Monday, July 5, at the Puerto Deportivo Marina Salinas, the Paralympic rowing boat acquired by the Club Náutico Marina Internacional for the rower Juan Luis Moraes Fiego was presented, thanks to the sponsorship of the joint venture AGAMED.

Approved the contracting file for the maintenance of the public roads of the municipal term of Torrevieja

02.07.2021
Approved the contracting file for the maintenance of the public roads of the municipal term of Torrevieja
The councilor secretary of the Local Government Board (JGL) of the Torrevieja City Council, Federico Alarcón, has reported that the Government Meeting held this morning has approved the contract file for the maintenance, conservation and repair of public roads of the Torrevieja municipal area, especially those that are part of the traffic road and sidewalks, and also including pedestrian paths and, in general, elements of public domain and use that the PGOU qualifies as such, whether they are urbanized or not, excluding the areas green that in the same way the PGOU qualifies as such, except for those services that are already included in some other maintenance contract (public lighting, traffic lights, road signs etc ...).

Next week the construction works of an accessible walkway in the Doña Inés urbanization will be completed

01.07.2021
Next week the construction works of an accessible walkway in the Doña Inés urbanization will be completed
The mayor of Torrevieja, Eduardo Dolón, and the Councilor for Quality of Urban Services, Sandra Sánchez, have visited this morning together with residents of the urbanization, the construction works of an accessible pedestrian walkway between the nearby cul-de-sac to Joaquín García Sánchez street, at the confluence with the Jardín del Mar III Urbanization, an area known as Doña Inés, due to the obvious need to transit through an area with a significant drop of 1.5 meters.