News

The City Council is putting out to tender the works for the repair and improvement of access and facilities on the beaches of Cala Piteras, Playa del Cura and Cabo Cervera

24.04.2026
The City Council is putting out to tender the works for the repair and improvement of access and facilities on the beaches of Cala Piteras, Playa del Cura and Cabo Cervera
The actions will improve accessibility, safety and the general condition of the infrastructure in three of the main coastal areas of the municipality

Torrevieja consolidates its leadership in sports tourism with a network of modern, sustainable and top-level facilities

21.01.2026
Torrevieja consolidates its leadership in sports tourism with a network of modern, sustainable and top-level facilities
Torrevieja currently boasts an extensive infrastructure network exceeding 400,000 square meters, primarily integrated within its Sports City. During 2025, Torrevieja experienced significant growth in sports tourism, registering a total of 40,892 participants in events and training camps, representing a 40% increase compared to 2024.

Awarded the contract for drafting the project for the construction of a heated swimming pool at the Torrevieja Sports City

14.11.2025
Awarded the contract for drafting the project for the construction of a heated swimming pool at the Torrevieja Sports City
This second heated swimming pool at the Torrevieja Sports Complex will have a basin measuring 25 meters long by 12.50 meters wide. With the aim of achieving complete integration with the existing spaces and facilities, the exterior space will be reorganized, incorporating new green areas and gardens.