News

In 2025, the PANGEA office served a total of 2,160 people from 56 different countries.

16.02.2026
In 2025, the PANGEA office served a total of 2,160 people from 56 different countries.
The Councillor for Coexistence and Integration, Óscar Urtasun, highlighted that in 2025 a total of 630 social integration reports were prepared, which represents an increase of 66% compared to 2024, mainly for Colombian (42%), Russian (20%), and Moroccan (8%) residents.

Torrevieja consolidates its leadership in sports tourism with a network of modern, sustainable and top-level facilities

21.01.2026
Torrevieja consolidates its leadership in sports tourism with a network of modern, sustainable and top-level facilities
Torrevieja currently boasts an extensive infrastructure network exceeding 400,000 square meters, primarily integrated within its Sports City. During 2025, Torrevieja experienced significant growth in sports tourism, registering a total of 40,892 participants in events and training camps, representing a 40% increase compared to 2024.

Torrevieja hosted Ecovidrio's "Fiestas con Eco" campaign during its Patron Saint Festivities

11.12.2025
Torrevieja hosted Ecovidrio's "Fiestas con Eco" campaign during its Patron Saint Festivities

Environmental educators visited the festival areas, encouraging residents to recycle glass to meet the recycling challenge set by Ecovidrio. The residents of Torrevieja recycled a total of 3,153,867 kilograms of glass containers. This means that each resident recycled an average of 31.4 kilograms of glass. Torrevieja has an average of 100 inhabitants per container, and currently has a total of 996 glass recycling containers installed throughout the municipality.

Awarded the contract for drafting the project for the construction of a heated swimming pool at the Torrevieja Sports City

14.11.2025
Awarded the contract for drafting the project for the construction of a heated swimming pool at the Torrevieja Sports City
This second heated swimming pool at the Torrevieja Sports Complex will have a basin measuring 25 meters long by 12.50 meters wide. With the aim of achieving complete integration with the existing spaces and facilities, the exterior space will be reorganized, incorporating new green areas and gardens.